Honda - Celaya, Mexico
Project scope
A drop-in place flood barrier system for the entrances to the two security checkpoint buildings.
Application: Integrated Protection
Product Type: V2100 (7’) FloodWall
Protection Line: Two section totaling around 44 linear ft.
Deployment Team Size & Time: 4 person team deployed in approx 1 hr.